Boston Renaissance Public Charter School

1415 Hyde Park Ave, Hyde Park, MA 02136

{"autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}

Architect: HMFH Architects, Inc.

General Contractor: Suffolk Construction

Panel Systems:
  • Bass Series 200 Pressure Equalized Rear Ventilated Rainscreen System
  • Morin – Kingspan Group – S-16 Concealed Fastener Single Skin Wall Panel
  • Morin – Kingspan Group – C-29- 7/8” Exposed Fastener Single Skin Wall Panel